TMPA PROJECT PROPOSAL

Gibbons Creek

Powering reliability then, now & next

For thirty-five years, Gibbons Creek generated electricity for Texas. The coal plant is now retired and demolished, but the site remains an important connection in the Texas grid.

TMPA proposes a new transmission station here to strengthen reliability for the Brazos Valley, with an approach that could meet multiple grid needs at one location and help limit the cost of new infrastructure.

Project status: ERCOT has submitted the project proposal for comment. Final project details are subject to change.

THE PROPOSAL AT A GLANCE

765 kV

A new high-voltage transmission station


2,700+ MW

More capacity to move power between the region and the statewide grid


June 2032

Estimated in-service date

WHY THIS LOCATION

Why Gibbons Creek?

A connection already in place

Gibbons Creek already brings together high-voltage lines serving the region. A new station would build on those connections, linking the existing network to the planned 765-kV grid and helping maintain stable voltage as power moves across Texas.

One station, multiple needs

Building a stronger grid also means making thoughtful choices about cost. TMPA’s proposal could meet multiple transmission needs at one location, potentially reducing the need for separate stations. That is the affordability opportunity at Gibbons Creek: strengthening reliability while making better use of the infrastructure already here.

THE PROPOSAL

What TMPA proposes

A new 765-kV station at the existing Gibbons Creek site.

Planned

765-kV grid

Proposed station

Gibbons Creek

Existing network

345 kV & 138 kV

The station would connect to the existing 345-kV and 138-kV network, helping more electricity move into and out of the region.

Its job would be to move power, not generate it. The retired coal plant would remain closed.

REGIONAL BENEFIT

A stronger connection for the Brazos Valley

Homes, businesses and critical facilities depend on a grid that can deliver power where it is needed. A new station at Gibbons Creek would strengthen the region’s connection to the statewide grid and provide a path for new generation seeking to connect in the area.

WHAT HAPPENS NEXT

Project status

ERCOT has submitted the project proposal for comment. Final project details are subject to change.

Next step

ERCOT will independently review TMPA’s proposal and its benefits to the grid.

PROJECT DOCUMENT

Project fact sheet

A one-page overview of the proposal and its key figures.

CONTACT TMPA

Questions about the proposal?